Our experience
A track record measured in decades, not deliverables
Having delivered exceptional results for more than 20 years, BMC Group has earned a reputation for delivering technically complex projects to the highest safety and quality standards.
Selected projects
Recent and ongoing works
Long-term agreements and repeat engagements are the strongest proof of trust — many of these relationships span a decade or more.
PowerAGL
Loy Yang A Electrical Services Agreement
Mechanical, electrical and instrumentation services including HV and LV under an ongoing agreement — with 10 HV/LV RICs authorised on site, capital projects, shutdowns and rapid mobilisation for unplanned outages.
Latrobe Valley, VIC
2016 – Current
PowerAlinta Energy
Loy Yang B Technical Labour Hire
Experienced LV and HV trades and supervision for ongoing maintenance and outages — HV electrical maintenance and capital works across the power station and mine, HV testing and transformer refurbishments.
Latrobe Valley, VIC
2019 – Current
Oil & GasJemena
EGP Reversal & Expansion
Awarded the project facilities' SMPE&I construction scope across all three locations — construction, fabrication, installation, inspection and testing — enabling reverse gas flow from NSW and the ACT back to Victoria.
Longford VIC; Mila & Michaelgo NSW
2025 – 2029
PowerSnowy Hydro
Valley Power Mechanical & Electrical Services
Fabrication, installation and HV electrical scope for the gas yard, plus lighting upgrades, EEHA audit, tank inspections and HV maintenance and testing.
Latrobe Valley, VIC
2020 – 2025
PowerEnergyAustralia
220kV Bushing Replacement — Six Unit Transformers
Comprehensive bushing replacement program across Jeeralang A and B Power Stations — cable bolt modification, bushing replacement, electrical testing and oil sampling, executed with precision to maintain transformer integrity.
Jeeralang, VIC
2025
WaterWatersure
Victorian Desalination Plant Ongoing Services
Over ten years on site — from initial workshop fabrication through construction and commissioning to ongoing mechanical, fabrication, structural and electrical maintenance at the 150GL/year plant.
Wonthaggi, VIC
2012 – Current
Oil & GasLochard Energy
Iona Gas Plant Maintenance, Projects & Shutdowns
15+ years at the Iona Gas Plant supporting fluctuating resource demands and technical requirements of major shutdowns and expansion projects, alongside ongoing maintenance and stay-in-business works.
Port Campbell, VIC
2016 – 2025
Oil & GasAPA Group
In-Service Welding Panel
Preferred supplier for in-service welding and repair sleeve installations — hot tapping, golden welds, Type B repair sleeves and Tremco PetroSleeve installation, with yearly APA qualifications maintained.
Various, VIC
2024 – Current
Renewable EnergyZenviron
Wooreen BESS Civil & Electrical Works
Civil and earthworks plus electrical and overhead transmission scopes for a landmark four-hour, 350MW utility-scale battery — enough to power ~230,000 homes and strengthen grid stability.
Latrobe Valley, VIC
2026
Renewable EnergyGranSolar
Fulham Solar Farm BESS Project
Civil and earthworks for the BESS foundation and screw piles, plus substation HV installation, for an 80MW solar farm DC-coupled with up to 128MWh of battery storage.
Fulham, VIC
2025 – 2026
InfrastructureAPA Group
T16 Relocation — Webster St Crossing Removal
Relocation and diversion of APA's DN750 gas transmission pipeline — 300m of below-ground pipeline including stringing, welding, NDT, hydrotesting, hot tap fittings, in-service welding, tie-ins and removal of ~70m of abandoned pipeline.
Dandenong, VIC
2025 – 2026
PowerOrigin Energy
Roma Power Station Electrical Maintenance
Circuit breaker retrofit, HV generator and rotor testing, HV electrical maintenance and protection relay validation testing across generator, transformer and feeder systems.
Roma, QLD
2023 – 2025
Start a conversation
Want the full project history?
Our capability statement covers contracts, clients and scopes across fabrication, mechanical, civil, E&I, transmission and shutdowns.